Facebook
Supply and Install Temporary Cover for APM Delivery Opening
Phase 2 Redevelopment of Ming Wah Dai Ha - Temporary Steel Staircase
Redevelopment of Grantham Hospital Phase 1 - Temporary Steel Platform
HY/2018/08 Central Kowloon Route - Central Tunnel - Supply, Fabrication, Delivery and Erection of Working Deck for the Ventilation Building at Ho Man Tin (2)
HY/2018/08 Central Kowloon Route - Central Tunnel -Supply, Fabrication, Delivery and Erection of Working Deck for the Ventilation Building at Ho Man Tin (1)
CV/2020/01 - Site formation and Infrastructure Works for Public Housing Developments at Pok Fu Lam South - Structural Steel Platform for RW1 & RW4B at Wah Fu North Site
Contract 3408 - Three Runway System Project - Third Runway Concourse and Approach Works - Installation of NAT Steel Structure
Contract 3802 - Three Runway System Project - APM and BHS Tunnels and Related Works - Site Installation of ELS Steel Modules & Decks
Contract C19W04- Midfield Temporary Stands Upgrading Works - Steel and Metal Works For Civil and Pavement and Substation B15
Commercial and Residential Project at Wong Chuk Hang Station - Installation and Removal of Temporary Road Gantry
Hong Kong Baptist University - The Development of Hostel and Academic Building Complex - EVA Hoarding
BU15734 - Structural Steelwork Package for the Proposed Residential Development at Lohas Park - On-site Erection of Structural Steelworks
MTRC C1123 - Structural Steel for Station Entrances Footbridge A & B and Platform Screen Door - PSD I Beam
EP/SP/10/91 - South-East New Territories (SENT) Landfill Extension - Supply, Fabrication and Installation of Structural Steel Maintenance Building Frame and Other Sundry Steel Fittings
NL/2017/03 - Tung Chung New Town Extension - Construction of Box Culvert No. 2 (In-situ Concrete Structure)
MTRC C1123 - Permanent Footbridge (Structural Steel Works and Movement Joints)
Contract 3206 - Three Runway System Project - Construction of Steel Deck for Eastern Construction Berth
HY/2018/08 - Central Kowloon Route - Central Tunnel - Dismantling of Existing Shaft Cover at HMT
CV/2016/06 - Widening of the footbridge at MTR Fanling Station - Hoardings and Pile Head Plates
HY/2016/03 - Lift and Pedestrian Walkway System at Waterloo Hill - Supply, Fabricate, Deliver and Erect of Steelwork
Black Point Power Station, Unit D1 Civil Works Contract - Bonna Pipe Installation
EP/SP/66/12 - Integrated Waste Management Fabilities - Design, Supply, Fabrication and Installation of Working Platform
HY/2013/01 - PCB Stainless Steel Welder Supply
HY/2013/02 - Gates and Untensioned Beam Barrier at HKZMB
NE201501/SC/095 - Lam Tin Tunnel Blast Door
NE201501/SC/080 - Lam Tin Tunnel Temporary Steel Bridge
HY/2013/01 - PCB Steel Structure Welder Supply
Contract No. P568 - Midfield Aporn Development Works
MTRC C1122 Project - Admiralty South Overrun Tunnel
MTRC C1112 OHL Structure at HungHom Station
MTRC C1121 Bottom Steel Plate for Immersed Tunnel Unit
Supply & Installation of BMU Track at Wynn Palace
HY/2013/13 Extension of the CITIC Tower Footbridge
HKZMB HY/2011/09 HKLR09
MTRC C1103 Noise Enclosure at HIK
HY/2010/02 HZMB HK Boundary Crossing Facilities - Reclamation Works
HY/2011/03 HZMB Scenic Hill & HK Boundary Crossing Facilities
MTRC C1103 Noise Enclosure at DIH
MTRC C1103 SCL King Post Strengthen Works
MTRC C901 SIL(E) Plunge Column Fabrication
MTRC C902 HKB Temporary Working Platform and Blasting Cover
J3468 - Contract P533 Midfield Concourse Works
MTRC C902 Nam Fung Tunnel Ventilation Buildings
Sludge Treatment Facilities (EP/SP/58/08)
MTRC C821Shek Yam to Mei Lai Road Tunnels
MTRC C901C901 Admiralty Integrated Station
MTRC C703SHW to SYP Tunnels
MTRC C703SHW to SYP Tunnels Steel Bridge & Noise Cover
Section S ofTseung Kwan O Town Lot No.39
Tsz Shan Monastery Development
Biodiesel Plant atTseung Kwan O
MTRC C703SHW to SYP TunnelsNoise Enclosure for KGV Shaft
Chinese Universityof Hong Kong
Lingnam University
City of Dreams (Macau)
Venetian (Macau) (Package 51275)
Venetian (Macau) (Package 2370)
Venetian (Macau) (Package 6210)