Project

Client Highways Department
Main Contractor Leighton - Chun Wo Joint Venture
Project Name/No. HY/2013/01 - PCB Steel Structure Welder Supply
Scope of Works PCB Steel Structure Welder Supply
Working Period Nov 2016 to Jun 2017
 
Click to zoom
 
2022

Contract 3408 - Three Runway System Project - Third Runway Concourse and Approach Works - Installation of NAT Steel Structure

Contract 3802 - Three Runway System Project - APM and BHS Tunnels and Related Works - Site Installation of ELS Steel Modules & Decks

Contract C19W04- Midfield Temporary Stands Upgrading Works - Steel and Metal Works For Civil and Pavement and Substation B15

Commercial and Residential Project at Wong Chuk Hang Station - Installation and Removal of Temporary Road Gantry

Hong Kong Baptist University - The Development of Hostel and Academic Building Complex - EVA Hoarding

BU15734 - Structural Steelwork Package for the Proposed Residential Development at Lohas Park - On-site Erection of Structural Steelworks

 
2021

MTRC C1123 - Structural Steel for Station Entrances Footbridge A & B and Platform Screen Door - PSD I Beam

EP/SP/10/91 - South-East New Territories (SENT) Landfill Extension - Supply, Fabrication and Installation of Structural Steel Maintenance Building Frame and Other Sundry Steel Fittings

 
2020

NL/2017/03 - Tung Chung New Town Extension - Construction of Box Culvert No. 2 (In-situ Concrete Structure)

MTRC C1123 - Permanent Footbridge (Structural Steel Works and Movement Joints)

Contract 3206 - Three Runway System Project - Construction of Steel Deck for Eastern Construction Berth

HY/2018/08 - Central Kowloon Route - Central Tunnel - Dismantling of Existing Shaft Cover at HMT

 
2019

CV/2016/06 - Widening of the footbridge at MTR Fanling Station - Hoardings and Pile Head Plates

HY/2016/03 - Lift and Pedestrian Walkway System at Waterloo Hill - Supply, Fabricate, Deliver and Erect of Steelwork

 
2018

Black Point Power Station, Unit D1 Civil Works Contract - Bonna Pipe Installation

EP/SP/66/12 - Integrated Waste Management Fabilities - Design, Supply, Fabrication and Installation of Working Platform

 
2017

HY/2013/01 - PCB Stainless Steel Welder Supply

HY/2013/02 - Gates and Untensioned Beam Barrier at HKZMB

NE201501/SC/095 - Lam Tin Tunnel Blast Door

NE201501/SC/080 - Lam Tin Tunnel Temporary Steel Bridge

 
2016

HY/2013/01 - PCB Steel Structure Welder Supply

Contract No. P568 - Midfield Aporn Development Works

MTRC C1122 Project - Admiralty South Overrun Tunnel

 
2015

MTRC C1112 OHL Structure at HungHom Station

MTRC C1121 Bottom Steel Plate for Immersed Tunnel Unit

Supply & Installation of BMU Track at Wynn Palace

 
2014

HY/2013/13 Extension of the CITIC Tower Footbridge

HKZMB HY/2011/09 HKLR09

MTRC C1103 Noise Enclosure at HIK

 
2013

HY/2010/02 HZMB HK Boundary Crossing Facilities - Reclamation Works

HY/2011/03 HZMB Scenic Hill & HK Boundary Crossing Facilities

MTRC C1103 Noise Enclosure at DIH

MTRC C1103 SCL King Post Strengthen Works

 
2012

MTRC C901 SIL(E) Plunge Column Fabrication

MTRC C902 HKB Temporary Working Platform and Blasting Cover

J3468 - Contract P533 Midfield Concourse Works

MTRC C902 Nam Fung Tunnel Ventilation Buildings

Sludge Treatment Facilities (EP/SP/58/08)

MTRC C821
Shek Yam to Mei Lai Road Tunnels

MTRC C901
C901 Admiralty Integrated Station

MTRC C703
SHW to SYP Tunnels

 
2011

MTRC C703
SHW to SYP Tunnels Steel Bridge & Noise Cover

Section S of
Tseung Kwan O Town Lot No.39

Tsz Shan Monastery Development

 
2010

Biodiesel Plant at
Tseung Kwan O

MTRC C703
SHW to SYP Tunnels
Noise Enclosure for KGV Shaft

Chinese University
of Hong Kong

 
Older

Lingnam University

City of Dreams (Macau)

Venetian (Macau)
(Package 51275)

Venetian (Macau)
(Package 2370)

Venetian (Macau)
(Package 6210)